Unit Assembly and Electrical Installation Miami, FL
Details
Client TIARA
Completed January 26th 2026
Timeframe Same Day Service
Location Miami
- Furniture Assembly
This project involved the multi-stage assembly of custom metal frames, combining high-end upholstery with precise electrical components
The base structure consists of a heavy-duty metal frame, inspected for stability and alignment before the mounting of interior components. A custom-cut wooden board, wrapped in premium velvet fabric, was securely attached to the interior of each frame. Great care was taken to ensure the fabric remains taut, centered, and free of imperfections
Two high-efficiency bar lights were precision-mounted onto the fabric-covered board. All mounting hardware was installed to be discreet while ensuring the light remains perfectly level. The electrical work included the installation of a junction box (mounted on the bottom per the latest project updates) and the routing of the 25-foot power cord.
Due to the thickness of the provided power cables, specialized routing was performed to ensure a clean finish and to prevent interference with the frame’s structural integrity. Each unit underwent a “power-on” verification using a circuit tester to confirm that the wiring, junction box, and bar light are fully operational.